A | Rio de Flag Flood Control Project - Update | ||||||
Community Development Director Dan Folke introduced the Rio de Flag project management team and turned the presentation over to City Engineer Rick Barrett who provided a PowerPoint presentation that covered the following: CITY OF FLAGSTAFF RIO DE FLAG FLOOD CONTROL PROJECT AGENDA PROJECT IMPORTANCE HISTORY AND BACKGROUND COST/FUNDING HISTORY RIO DE FLAG MAINSTEM PROJECT MAP CLAY WASH DETENTION BASIN BUTLER TUNNEL THORPE BRIDGE COMPLETED PRELIMINARY PROJECT ELEMENTS THORPE PARK BALL FIELDS ADDRESSING COMMUNITY CONCERNS DETENTION AND FLOODWALLS THORPE PARK DETENTION ALTERNATIVE – 2000 FEASIBILITY STUDY NAVAJO DRIVE FLOOD WALL OPEN CHANNEL COMPOSITE CHANNEL – UPPER REACH CLAY AVENUE REACH CROSS SECTIONS WEST SECTION – OPEN CHANNEL EAST SECTION – CLOSED CHANNEL LOWER REACH CROSS SECTION FEMA DESIGN CONCEPT REPORT Project Manager Trevor Henry continued the presentation. PROJECT COST PROJECT SCHEDULE CURRENT TOPICS US ARMY CORP BNSF RAILWAY CITY OF FLAGSTAFF CURRENT TOPICS PUBLIC OUTREACH SUMMARY A break was held from 8:40 p.m. through 8:51 p.m. The following individuals addressed Council:
The following individuals submitted written comment cards in opposition to the Army Corp design plans:
Council discussed the project and decided to stay the course and continue working with the Army Corp. |
|||||||
Moved by Councilmember Austin Aslan, seconded by Councilmember Charlie Odegaard to pick up tabeled item 16B and continue the meeting in accordance with the Council Rules of Procedure. | |||||||
Vote: 7 - 0 - Unanimously | |||||||
Council returned to Item 16B. | |||||||